At Denison Power + Compute, we're redefining the data center industry from the heart of Texas. Powered by natural gas from the Permian Basin and being located in the center of the largest oil and gas field in the US, we can deliver a state-of-the-art data center while keeping costs exceptionally low.
As proud members of the Tarzan community, we're turning our small town into a hub for advanced technology while upholding the Texas-sized service and reliability our customers expect.
Engineered to operate reliably in harsh environments
Lowers upfront greenfield deployment costs by up to 30%
Reduces energy consumption by up to 90% with innovative cooling technology
Connected to the grid with a Power Purchase Agreement (PPA) to sell your excess power generation
Collaborates with MIT and industry leaders like Elgin Power Solutions
Integrates cutting- edge computing infrastructure with a diversified energy approach
Leverages natural gas for reliability and optimal performance
Enhanced returns for your investment
Implements dual power backup systems: Battery Backup and Secondary alternative fuel generator for battery charging
Utilizes alternative fuels including hydrogen, biogas, biomethane, Renewable Natural Gas (RNG), BioPropane, and Hydrotreated Vegetable Oil (HVO)
Implements dual power backup systems: Battery Backup and Secondary alternative fuel generator for battery charging
Implements dual power backup systems: Battery Backup and Secondary alternative fuel generator for battery charging
Our Strategic Partners are essential to delivering resilient, high-performance infrastructure. We work with best-in-class leaders across technology, energy, and infrastructure to drive innovation, efficiency, and long-term value throughout the lifecycle of our data centers.
Mission Critical Group (MCG) is a U.S.-based electrical systems and solutions provider that reduces time-to-power through its broad product portfolio, modular solutions, and more than one million square feet of U.S. manufacturing capacity. READ MORE